Mounting Instructions for Bike-Vise: 16 photos with FAQ
click on pictures to enlarge


 



Photo 1:  
Tools for Installation
-Drill and a 11/32" bit for drilling holes.
-16mm socket and wrench (5/8" can be used).
-Measuring tape to "square" unit to trailer walls
-Pencil
-Bike Vise kit hardware
-"Thread Lock" may be used, if so desired, in place of lock-nuts.
 

Photo 2:   
Assemble Left Side of Bike Vise First
-Use the 4 shortest bolts to mount the screwjack shaft to the mount.
-Use 2 Long bolts to mount the Left Leg to the yoke.
-Secure all bolts with 2 nuts (i.e. a "locking nut") provided with kit.
 

Photo 3:   
Placement of Bike Vise
-Allow adequate distance from the side of the trailer to turn handle.
-Allow for motorcycle clearance from side of trailer.
-Mark & Drill the hole indicated by the YELLOW pencil first.
 -Place a bolt into drilled hole for vise alignment.
-Go to next photo

Next Page